- Need Help?
- Call Us : +23273952144
Project Name: 108.4 MW CCPP AND UPGRADE WORKS OF 33KV NETWORK
Project Location: Wilberforce, Freetown, Sierra Leone.
Company Name: Shapoorji Pallonji EPC
Contact Person: Prashant Durge
Phone: +23275933000
Email: Prashant.durge@specpsl.com
PROJECT OVERVIEW
Shapoorji Pallonji- EPC is currently accepting proposals for your services on construction of 108.4-MW combined cycle gas turbine(CCGT) power plant, with ancillary equipment including horizontal LPG system (pipeline and fuel tanks that are buried in earthen berms for enhanced fire protection), diesel back up fuel system, transmission line and switchgear infrastructure, water supply infrastructure (including seawater abstraction/ discharge lines and a desalination plant) and a stormwater discharge pipeline. Our objective is to partner with a qualified contractor to deliver high-quality results while adhering to the outlined timeline, budget, and specifications.
SOPE OF WORK SUMMARY
REQUIRED DOCUMENTATION AND ADDITIONAL CONSIDERATIONS
Innovative methods or value engineering recommendations are extremely encouraged.
Please find the attached downloadable documents:
Project Name: 108.4 MW CCPP AND UPGRADE WORKS OF 33KV NETWORK
Project Location: Wilberforce, Freetown, Sierra Leone.
Company Name: Shapoorji Pallonji EPC
Contact Person: Prashant Durge
Phone: +23275933000
Email: Prashant.durge@specpsl.com
PROJECT OVERVIEW
Shapoorji Pallonji- EPC is currently accepting proposals for your services on developing a power generation complex in an industrial area of Freetown, Sierra Leone. This Power Generation Project will consist of combined cycle gas turbine (CCGT) power blocks with a 108.4-megawatt (MW) gross output. The CCGT power block will be fueled by Liquified Petroleum Gas (LPG) delivered by barge from the New Kissy Jetty. Generated Power shall be evacuated through two transmission lines, which commence from Kissy Project Power Station at Sierra Leone, Line 1– runs in west direction to the power station, along the Bai Bureh Road and terminates at Cline Town Substation. Line 2– runs in east direction to the power station, along the Bai Bureh Road and terminates at Wellington Substation.
SOPE OF WORK SUMMARY
REQUIRED DOCUMENTATION AND ADDITIONAL CONSIDERATIONS
Innovative methods or value engineering recommendations are extremely encouraged.
Please find the attached downloadable documents:
Project Overview: The project involves the construction and commissioning of a 108.4 MW power plant, requiring a diverse workforce across multiple disciplines.
Manpower Requirements: We require experienced manpower suppliers who can provide the following personnel:
Eligibility Criteria for Manpower Suppliers:
Application Process: Interested and qualified manpower supply agencies are invited to submit their Expression of Interest (EOI) along with supporting documents, including:
Submission Details: Applications should be submitted to the undersigned on or before 27-02-2025 at the following address:
Shapoorji Pallonji And Company Private Limited
Name: Mr. Biplab Rakshit (Manager HR & Admin)
Phone: +232 73882901
Email: biplab.rakshit@shapoorji.com
SPCPL reserves the right to shortlist and select manpower suppliers based on project requirements and company evaluation.